GB/T 50378-2019 第2.0.2条
| | **Fully finished**: The fixed surface finishes and the installation of equipment and facilities in the building's functional spaces are all completed, meeting the basic requirements for the building's use functions and performance. Hotel buildings generally need to meet fully finished requirements, involving the integrated installation of MEP systems (such as lighting, air conditioning, and water supply and drainage). |