GB 50052-2009 第1.0.6条
| The power supply and distribution system design should allow for future expansion and consider the possibility of phased construction.
| The power supply and distribution system design should allow for future expansion and consider the possibility of phased construction.
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.