GB 7588-2003 第2.5条
- If the hotel elevator rated speed v is relatively high (e.g., ≥ m/s), additional attention must be paid to the matching calculation of overhead clearance and buffer stroke.
- If the hotel elevator rated speed v is relatively high (e.g., ≥ m/s), additional attention must be paid to the matching calculation of overhead clearance and buffer stroke.
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.