[MEP Director] How long is the design cycle for a hotel MEP system typically?
Depending on scale and complexity, schematic design generally takes 3-5 days, preliminary design 7-14 days, and construction drawing design 14-30 days. For five-star hotels, due to system complexity, it is recommended to allow sufficient design time to avoid later changes.