ME HotelM&E AI
Home › FAQ › Fire protection engineering › Fire resistance rating re…

Fire-resistance rating requirements for smoke control fans and ducts in hotels

Fire protection engineeringUpdated 2026-05-13

I am fire protection expert Alexander Li. As hotels are assembly occupancies, the fire resistance rating requirements for smoke control and exhaust systems directly affect the saf…

Fire-resistance rating requirements for smoke control fans and ducts in hotels

I am fire protection expert Alexander Li. As hotels are assembly occupancies, the fire resistance rating requirements for smoke control and exhaust systems directly affect the safe evacuation of occupants and the effectiveness of smoke control during a fire, and are among the core safety indicators in fire protection design. Based on years of engineering experience, I have handled multiple hotel projects involving acceptance rectification cases caused by insufficient fire resistance ratings of ducts, so the standards must be strictly followed.

Detailed Analysis


The fire resistance rating requirements for smoke control and exhaust fans and ducts in hotels are mainly based on the Technical Standard for Smoke Control and Exhaust Systems in Buildings (GB 51251-2017) and the Code for Fire Protection Design of Buildings (GB 50016-2014, 2018 edition). The details are as follows:

1. Fire Resistance Rating Requirements for Smoke Control and Exhaust Fans

2. Fire Resistance Rating Requirements for Smoke Control and Exhaust Ducts
3. Requirements for Special Locations

Concluding Summary


The fire resistance rating of machine room separation for hotel smoke control and exhaust fans shall not be less than 2.00h (partitions) and 1.50h (floor slabs); the fire resistance rating of ducts penetrating fire compartments shall not be less than 1.00h; horizontal ducts within ceilings may be reduced to 0.50h, but specific working conditions and fire-resistant wrapping treatment must be taken into account. During design, the relevant clauses of GB 51251-2017 and GB 50016 must be verified to avoid acceptance risks.
The above are reference opinions. The actual project conditions still need to be further comprehensively evaluated and implemented in combination with specific working conditions, site conditions, and other factors.

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.