What are the key acceptance indicators during the MEP commissioning phase?
<p>Key acceptance indicators:</p><ul><li><strong>Ventilation and air conditioning</strong>: air volume balance, temperature and humidity, cleanliness</li><li><strong>Water supply and drainage</strong>: water pressure test, water quality testing</li><li><strong>Electrical</strong>: insulation resistance, earthing resistance, load test</li><li><strong>Fire protection</strong>: linkage test, response time, fire hydrant discharge</li></ul>