What are the requirements for the design of a diesel generator room? How should the fuel storage room, exhaust, and ventilation be designed?

Electrical EngineeringUpdated 2026-05-13

I am electrical expert James Li, specializing in power supply and distribution system design and code application. The diesel generator room requirements you mentioned are a core …

What are the requirements for the design of a diesel generator room? How should the fuel storage room, exhaust, and ventilation be designed?

I am electrical expert James Li, specializing in power supply and distribution system design and code application. The diesel generator room requirements you mentioned are a core part of building electrical design for ensuring the reliability and safety of emergency power, and for Class I load users such as hotels, hospitals, and data centers, they bear directly on life and property safety. GB 50016 "Code for Fire Protection Design of Buildings" and GB 50052 "Code for Design of Power Supply and Distribution Systems" contain mandatory provisions on this. Below, drawing on engineering experience, I will analyze in detail from four aspects: generator room location, oil storage room, exhaust, and ventilation.

1. General Requirements for Diesel Generator Room Layout

According to Article 5.4.13 of GB 50016, a diesel generator room should be located on the first floor or basement level 1 of the building (it should not be located on the floor above, the floor below, or adjacent to densely occupied areas), and should be separated from other areas by fire partitions with a fire resistance rating of not less than 2.00 h and noncombustible floor slabs with a rating of 1.50 h. The generator room should be provided with an automatic fire alarm system and fire-extinguishing equipment (such as gas extinguishing or water spray). For example, in a five-star hotel project I was involved in, the generator room was located on basement level 1, adjacent to the transformer and distribution room, but separated by fire walls and Class A fire doors, avoiding noise and vibration disturbance to guest room areas.

2. Key Design Points for the Oil Storage Room

The oil storage room is a safety priority in the generator room. According to Article 5.4.14 of GB 50016, the oil storage room should be provided independently, with total storage not exceeding 1 m³, and should be separated from the generator room by a fire wall (fire resistance rating not less than 3.00 h), with a Class A fire door on the door. In actual projects:

3. Exhaust System Design

Generator exhaust (i.e., waste gas) must meet environmental and fire protection requirements. With reference to Article 5.4.13 of GB 50016 and 《Code for Design of Heating, Ventilation and Air Conditioning of Civil Buildings》 GB 50736, the exhaust pipe should:

4. Ventilation System Design

Generator room ventilation must satisfy both heat dissipation and combustion air demand. According to Article 6.0.2 of GB 50052 and 《Code for Design of Heating, Ventilation and Air Conditioning of Industrial Buildings》 GB 50019:

Summary

The layout of a diesel generator room must strictly follow GB 50016 and GB 50052, with key control of the generator room fire compartment, oil storage room capacity and explosion protection, exhaust pipe insulation and environmental protection, and ventilation heat dissipation and interlock control. In actual projects, I have saved 20% of civil construction cost by optimizing the oil storage room location and exhaust route while ensuring safety. It is recommended to coordinate with the architectural and HVAC disciplines at the preliminary design stage to avoid later rework.

The above are reference opinions. The actual project situation still needs further comprehensive evaluation and implementation in combination with specific operating conditions, site conditions, and other factors.

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.