Construction Process Equipment Selection and Configuration Guide

Construction workmanship Updated 2026-04-25 0 views

Provide selection methods and configuration guidelines for equipment related to hotel MEP engineering construction processes, covering the selection criteria and configuration schemes for core equipment such a…

1. Selection Guide for Heating and Cooling Source Equipment

Heating and cooling source equipment is the core of the hotel MEP system, and selection is based on GB 50736-2012. Selection steps: calculate the cooling and heating loads using the hourly load calculation method or the budget estimate index method; hotel cooling load index 80-120 W/sqm, heating load index 60-100 W/sqm; determine the chiller type: centrifugal for large units greater than or equal to 500 RT, screw for medium units 200-500 RT, scroll for small units less than 200 RT; energy efficiency selection: COP greater than or equal to 6.0 for centrifugal chillers at Grade 1 energy efficiency, or greater than or equal to 5.2 for screw chillers at Grade 1 energy efficiency; IPLV greater than or equal to 8.5 for centrifugal or greater than or equal to 7.5 for screw. Refrigerant selection: low-GWP refrigerants such as R134a/R1234ze/R32. Quantity configuration: n+1 redundancy principle, with single-unit capacity less than or equal to 60% of total capacity.

2. Selection Guide for Pumps and Fans

Pump selection is based on GB 50265-2010. Selection factors: flow rate selected at 1.1 times the system design flow rate; head = resistance of the most unfavorable loop plus equipment resistance plus safety margin of 10%-15%; pump type: chilled water and cooling water pumps as horizontal end-suction centrifugal pumps or vertical inline pumps, hot water pumps as heat-resistant type; energy efficiency greater than or equal to the energy-saving evaluation value in GB 19762-2007, with highest efficiency when specific speed ns is in the range of 100-200; VFD configuration: frequency converters recommended when motor power is greater than or equal to 15 kW. Fan selection is based on GB/T 1236-2017. Selection factors: air volume calculated according to room air changes and supply air temperature difference; total pressure overcomes duct resistance plus equipment resistance plus outlet dynamic pressure.

3. Selection Guide for Air-Conditioning Terminal Units and Valves

Air-conditioning terminal unit selection: air handling units (AHU) classified by function as primary return air, secondary return air, and 100% fresh air; cooling coil rows 4-8; air volume range 5,000-80,000 CMH; external residual pressure 200-600 Pa; fresh air handling units (PAU) handle the fresh air load and are equipped with heat recovery devices: rotary wheel, plate, heat pipe; heat recovery efficiency greater than or equal to 60%; fan coil units (FCU) used in guest rooms and office areas, by model 2-row or 3-row coils, air volume 340-2,380 CMH. Valve selection guide: types: gate valves for full open/full close service, globe valves for throttling service, butterfly valves for large-diameter on/off service, balancing valves for hydraulic balancing, electric control valves for automatic control; size: same as pipe diameter or one size smaller; control valves should preferably be one size smaller to improve control performance.

4. Selection Guide for Piping and Insulation Materials

Piping selection: air-conditioning chilled/hot water pipes DN less than or equal to 50 mm use galvanized steel pipes with threaded connections; DN greater than or equal to 65 mm use seamless steel pipes with welding or spiral welded pipes; condensate drain pipes use UPVC pipes or galvanized steel pipes, laid according to drainage slope; cooling water pipes DN greater than or equal to 100 mm recommend GRP (glass-reinforced plastic) pipes or anti-corrosion-treated steel pipes; fire protection water pipes use internally and externally hot-dip galvanized steel pipes with grooved connections or flange connections. Insulation material selection: air-conditioning cooling pipes use rubber-plastic sponge, closed-cell structure, with integral vapor barrier, thermal conductivity less than or equal to 0.039 W/(m*K), Class 0, B1 flame retardant, applicable temperature -40 degrees to 105 degrees; air-conditioning heating pipes use glass wool or rubber-plastic, thickness calculated according to medium temperature; duct insulation uses rubber-plastic board or glass wool board plus vapor barrier.

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.