Energy efficient operation and scientific maintenance of cooling towers are key technical measures for five star hotels to reduce the comprehensive energy consumption of air conditioning systems and extend equ…

Cooling Tower Variable-Frequency Energy-Saving Operation Control Strategy

The energy consumption of a cooling tower consists of two parts: fan energy consumption and pump energy consumption, of which fan energy consumption accounts for approximately 60%-70% of the total cooling tower energy consumption. Variable-frequency speed control can precisely adjust fan speed according to actual heat load demand, achieving significant energy savings while ensuring cooling performance. According to Article 8.7.4 of GB 50736 "Code for Design of Heating Ventilation and Air Conditioning of Civil Buildings," cooling tower fans should adopt variable-frequency speed control, automatically adjusting fan speed based on cooling water outlet temperature. Control strategies for cooling tower variable-frequency control: (1) Constant outlet temperature control strategy: Install a temperature sensor on the cooling tower outlet header, set the outlet temperature value (e.g., 32°C), and the PID controller adjusts fan frequency based on the deviation between measured temperature and setpoint. When outlet temperature is above the setpoint, increase fan frequency; when below the setpoint, decrease frequency. This strategy is simple to control and fast in response, but cannot fully exploit the energy-saving potential when outdoor wet-bulb temperature is low. (2) Approach control strategy: Measure outdoor wet-bulb temperature and cooling tower outlet temperature, calculate the approach (outlet temperature - wet-bulb temperature), and adjust fan frequency based on the approach setpoint (typically 3-5°C). When the approach is less than the setpoint, reduce fan frequency until the approach rises back to the setpoint. This strategy can fully utilize low wet-bulb weather conditions, saving 10%-20% more energy than constant temperature control. (3) Cooling water temperature optimized reset strategy: Dynamically adjust the cooling water temperature setpoint based on the chiller performance curve to minimize the total energy consumption of the chiller and cooling tower. A typical strategy is: when outdoor wet-bulb temperature is below design conditions, allow the cooling water outlet temperature to decrease to 22-28°C (below the design value of 32°C); at this point the chiller COP significantly improves, and although cooling tower fan energy consumption slightly increases, the combined energy consumption can be reduced by 8%-15%. Constraints for cooling water temperature reset: Chillers have a limit on minimum cooling water temperature (generally not lower than 20°C) to prevent excessive lubricating oil viscosity and refrigerant migration issues. Technical requirements for fan variable-frequency drives: Fan motors should use inverter-duty motors (with independent cooling fans), and inverters should use vector-type inverters with PID control functions, with an output frequency range of 15-50Hz. A du/dt filter should be installed on the inverter output side to reduce damage to motor insulation from variable-frequency harmonics. When multiple cooling towers operate in parallel, each fan should be equipped with an independent inverter to achieve independent variable-frequency control. Multiple cooling towers can adopt an average load control strategy: when total heat rejection is less than the rated capacity of one tower, operate only one tower at reduced variable frequency; when demand exceeds the capacity of one tower, start the second tower and operate both towers at the same frequency. Marriott MIDS standards require cooling tower fans to adopt variable-frequency control with manual bypass functionality. According to actual project statistics, the energy-saving rate of cooling tower fan variable-frequency retrofits is 50%-70%, with an investment payback period of approximately 1-2 years.

Cooling Tower Fill Cleaning and Performance Recovery Technology

Cooling tower fill is the core component for heat and moisture exchange, and its cleanliness directly affects the heat dissipation efficiency of the cooling tower. Fill blockage and scaling are the main causes of cooling tower performance degradation, which can reduce cooling tower heat dissipation capacity by 20%-40%. According to GB/T 7190.1 "Glass Fiber Reinforced Plastic Cooling Towers Part 1: Small and Medium-sized Cooling Towers" and the relevant requirements of the ASHRAE Handbook HVAC Applications, cooling tower fill should be regularly cleaned and maintained. Fill contamination mechanisms: (1) Algae growth: Cooling towers operate in sunlight, and nutrients in the circulating water provide growth conditions for algae. Algae attach to the fill surface, obstructing airflow and water flow passages, reducing the effective heat exchange area of the fill. (2) Scale deposition: Calcium and magnesium ions in the circulating water deposit on the fill surface to form scale (mainly CaCO₃). The thermal conductivity of scale is only 1/50-1/100 that of metal, seriously affecting heat exchange efficiency. (3) Dust and silt: Dust and silt in the air enter the fill interior through the air inlet, blocking fill passages. Fill cleaning frequency: Based on water quality and air quality conditions, cleaning every 3-6 months is generally recommended. In environments with poor water quality (high hardness, high turbidity) or poor air quality (high dust), the interval should be shortened to 2-3 months. Cleaning timing: Schedule one cleaning before the cooling season begins, one at mid-season (August), and one after the cooling season ends. Fill cleaning methods: (1) High-pressure water jet cleaning: Use a high-pressure water gun (pressure 5-8MPa) to flush the fill from top to bottom, with water flow direction consistent with normal operation flow direction. Control water pressure during flushing to avoid damaging the fill structure. This method is suitable for algae and dust contamination. (2) Chemical cleaning: For severely scaled fill, use specialized cleaning agents (acidic cleaning agents, pH 2-3) for circulating cleaning. After the cleaning agent circulates in the system for 30-60 minutes, drain and rinse with clean water until neutral (pH 6-8). Pay attention to corrosion protection of metal components by cleaning agents; after cleaning, neutralize the collection basin and piping. (3) Removal and soaking: For removable fill modules, remove and soak in a cleaning tank (using neutral cleaning agents), then flush with high-pressure water. This method provides the best cleaning results but requires extensive disassembly work and long downtime. Fill replacement cycle: The service life of general PVC fill is 8-12 years. Fill should be replaced when the following conditions occur: embrittlement and fragmentation (fill sheets become brittle, with fractured area exceeding 15%), severe blockage that cannot be restored (effective ventilation area reduced by more than 30%), discoloration and deformation (UV aging causing discoloration, thermal deformation causing inconsistent sheet spacing). When replacing with new fill, flame-retardant PVC fill should be selected with an oxygen index of not less than 30%. Performance verification after fill cleaning/replacement: The following comparative tests should be conducted before and after cleaning/replacement: cooling water inlet-outlet temperature difference (should be no less than 4.5°C under standard conditions), inlet-exhaust air temperature difference (corresponding to no less than 8°C), fan operating current (should decrease by 5%-15% due to reduced resistance).

Cooling tower water flow balance adjustment and optimization

The uniformity of cooling tower water flow distribution is a key factor affecting overall heat dissipation efficiency. When multiple cooling towers operate in parallel, differences in water flow among towers cause some cooling towers to be over-supplied (water temperature drops quickly but unevenly) while others are under-supplied (insufficient heat dissipation), reducing overall system efficiency. According to Section 6.2 of GB/T 7190.1 "Glass fiber reinforced plastic cooling towers," the inlet water flow deviation of cooling towers should be controlled within ±10% of the design flow. Analysis of causes of uneven water flow: (1) Improper piping layout: different inlet pipe lengths and numbers of elbows among cooling towers lead to differences in water resistance, and flow naturally biases toward low-resistance towers. (2) Improper valve adjustment: inconsistent manual valve openings or no adjustment over a long period. (3) Distribution pipe blockage: partial blockage of the internal distribution pipes (or distribution troughs) of cooling towers leads to uneven water distribution within the tower. Flow balance adjustment methods: (1) Install static balancing valves or regulating valves on each branch of the inlet pipes; by measuring the actual inlet flow of each tower, adjust valve openings so that the flow deviation of each tower is controlled within ±5%. For newly installed systems, it is recommended to install a static balancing valve on the inlet pipe of each cooling tower. (2) Adopt reverse-return piping layout: the inlet pipes of each cooling tower are led from the supply/return headers with essentially equal lengths, reducing resistance differences. (3) Install flow meters and sight glasses: install flow meters (or use portable ultrasonic flow meters for temporary measurement) and acrylic sight glasses on each cooling tower inlet pipe to facilitate routine inspection of water distribution. Inspection criteria for water distribution uniformity: under normal operating conditions, open the cooling tower access door to observe water distribution. Counterflow towers: the water output of distribution pipe nozzles should be uniform, with no obvious bias flow or individual nozzles blocked and not discharging water. Crossflow towers: the water level in the top distribution troughs should be essentially consistent, with a level difference not exceeding 10 mm. The overflow outlet of the distribution trough should have an appropriate amount of overflow, indicating sufficient distribution water volume. Energy-saving benefits of water flow optimization: when the flow deviation among cooling towers is optimized from ±20% to ±5%, the overall system heat dissipation efficiency can increase by 5%–10%. Taking a project in Shanghai as an example, through flow balance adjustment, the average outlet water temperature of the cooling tower group decreased by 0.8°C, chiller COP increased by about 2.5%, and annual electricity savings were about 60,000 kWh. For cooling towers already in operation, it is recommended to check and record the inlet flow and water distribution uniformity of each tower quarterly and adjust promptly. Flow balance adjustment should be carried out in conjunction with cooling tower maintenance to avoid repeated shutdowns. The Marriott MIDS standard requires that balancing valves and flow measurement devices be installed on cooling tower inlet pipes.

Cooling tower water treatment and Legionella prevention and control

Cooling tower circulating water quality management is a key measure to ensure the normal operation of cooling towers and prevent equipment scaling, corrosion, and Legionella risk. According to GB 50050 "Code for Design of Industrial Circulating Cooling Water Treatment" and Article 8.7.5 of GB 50736 "Code for Design of Heating Ventilation and Air Conditioning of Civil Buildings," cooling tower circulating water shall undergo water quality treatment, and Legionella testing shall be conducted periodically. Main contents of cooling tower water treatment: (1) Corrosion and scale inhibition treatment: corrosion and scale inhibitors (such as composite formulations of polyphosphates, phosphonates, zinc salts, etc.) are dosed through automatic dosing equipment, with a dosing concentration generally of 5-15 mg/L (adjusted according to water quality conditions). Corrosion and scale inhibitors can effectively control the formation of deposits such as calcium carbonate and calcium phosphate, while forming a protective film to prevent metal corrosion. (2) Sterilization and algae removal treatment: alternating dosing of oxidizing biocides (such as sodium hypochlorite, bromine tablets) and non-oxidizing biocides. The sodium hypochlorite dosing amount is controlled at a residual chlorine of 0.5-1.0 mg/L, dosed 1-2 times per day. Non-oxidizing biocides (such as isothiazolinone) are dosed once per week (concentration 10-20 mg/L) to prevent microorganisms from developing resistance. (3) pH adjustment: the pH value of cooling water should be controlled between 7.0-9.0, with sulfuric acid or hydrochloric acid automatically adjusted to the optimal range (7.5-8.5). Automatic control system for water treatment: the automatic dosing equipment consists of a conductivity controller, pH controller, dosing pump, and chemical storage tank. The conductivity controller automatically controls the opening and closing of the blowdown valve; when the conductivity exceeds the set value (e.g., 2,500 μS/cm), blowdown and makeup with fresh water are automatically performed. The pH controller automatically adjusts the acid dosing amount according to the real-time pH value. Legionella prevention and control: Legionella is an important public health risk in cooling tower operation, and infection can cause Legionnaires' disease (fatality rate approximately 10%). Article 8.7.5 of GB 50736 requires that cooling tower circulating water be periodically tested for Legionella, and the Legionella concentration in pool water shall not exceed 100 CFU/mL. Prevention and control measures include: (1) Keeping the cooling water temperature outside the range of 20-45°C is preferable (the suitable proliferation temperature for Legionella is 25-42°C). (2) Periodic shock dosing of biocides (once per month, using high-concentration oxidizing biocides). (3) Quarterly dedicated Legionella testing, with sampling locations at the collection basin and cooling tower outlet. (4) The cooling tower exhaust outlet should not face the fresh air intake or guest room windows, and the exhaust diffusion diameter should be determined by calculation. Makeup water quality management: cooling tower makeup water should use tap water or softened water. When the makeup water hardness is high (total hardness >200 mg/L), it is recommended that the makeup water be softened first to reduce scaling risk. The makeup water pipe should be provided with a backflow preventer (in accordance with GB 50015 requirements) to prevent cooling water backflow from contaminating the municipal water supply network. Blowdown management: the cooling tower blowdown volume is generally controlled at 0.5%-1.5% of the circulating water volume, and blowdown methods are divided into timed blowdown and conductivity-controlled blowdown. Conductivity-controlled blowdown is more scientific and achieves better water-saving effects (can save 10%-20% of makeup water).

W
William Zhang
HVAC Expert
HVAC Expert — View profile

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.